Del. no.Deliverable name WP no. Lead beneficiaryNature Dissemi-nation level Delivery date (proj.month)Delivery date: Calendar month
D1.1 METAFOR web site WP1 UREAD O PU/RE M03 May 2008
D7.1 Formal Use Cases WP7 UREAD R RE M03 May 2008
D2.1 Metadata Gap Analysis Report WP2 UREAD R PP M03 May 2008
D7.2Detailed dissemination plan WP7 UREAD R RE M03 May 2008
D7.3EC dissemination material WP7 UREAD O PU M03 May 2008
D7.4 Leaflet presenting objectives of METAFOR WP7 UREAD O PU M06 September 2008
D7.2 Detailed dissemination plan WP7 UREAD R RE M 09 December 2008
D7.3 EC dissemination material WP7 UREAD O PU M09 December 2008
D1.5 MGT and annual reporting WP1 UREAD R RE M12 March 2009
D2.2Abstract CIM, with current internal and external schemas WP2 UREAD P CO M12 March 2009
D7.2Detailed dissemination plan WP7 UREAD R RE M15 June 2009
D7.3EC dissemination material WP7 UREAD O PU M15 June 2009
D4.1Single-Sign-On Evaluation WP4 BADC R PU M16 July 2009
D1.2Identify new partners for WP3 WP1 UREAD R RE M18 September 2009
D6.1Automatic Capture Tools WP6 MPG P RE M18 September 2009
D2.3Actual CIM for delivery of METAFOR tools and services WP2 UREAD P CO M18 September 2009
D7.2Detailed dissemination plan WP7 UREAD R RE M 21 December 2009
D7.3EC dissemination material WP7 UREAD O PU M21 December 2009
D6.3 Human GUI WP6 MPG D RE M21 December 2009
D1.5 MGT and annual reporting WP1 UREAD R RE M 24 March 2010
D2.4Revised CIM, after initial population WP2 UREAD P RE M24 March 2010
D4.2 OAI System Deployed WP4 BADC D PU M24 March 2010
D5.1Query Tool WP5 UKMO P RE M24 March 2010
D5.2Difference Engine Implementation WP5 UKMO P RE M24 March 2010
D5.3 Presentation Tools WP5 UKMO P RE M24 March 2010
D7.5 Leaflet presenting findings and recommendations WP7 UREAD O PU M26 May 2010
D6.4 CIM creation tool infrastructure WP6 MPG P RE M27 June 2010
D5.5 Web Service Implementations WP5 BADC D PU M27 June 2010
D7.2 Detailed dissemination plan WP7 UREAD R RE M 27 June 2010
D7.3 EC dissemination material WP7 UREAD O PU M27 June 2010
D6.2 Revised Automatic Capture Tools WP6 MPG D RE M30 September 2010
D5.4 Data Transformation Tools WP5 UKMO P RE M30 September 2010
D3.1 Service Testing CIM Metadata in system WP3 CNRS P PU M33 December 2010
D4.3 Portal Deployed WP4 BADC D PU M33 December 2010
D4.4 Help Desk Deployed WP4 BADC O PU M33 December 2010
D7.2 Detailed dissemination plan WP7 UREAD R RE M 33 December 2010
D7.3 EC dissemination material WP7 UREAD O PU M 33 December 2010
D1.5 MGT and annual reporting WP1 UREAD R RE M 36 March 2011
D2.5 Final CIM, after further population and testing WP2 UREAD D PP M36 March 2011
D5.6 Revised Tools and Services WP5 UKMO D PU M36 March 2011
D5.7 CIM-enabled OASIS WP5 CERFACS D PU M36 March 2011
D5.8 CIM-enabled BFG WP5 UNIMAN D PU M36 March 2011
D6.5 Revised Infrastructure WP6 MPG D PP M36 March 2011
D7.6 Open dissemination Workshop WP7 UREAD O PU M36 March 2011
D1.6 End-to-end capabilities demonstration WP1 UREAD D PU M36 March 2011
D7.2 Detailed dissemination plan WP7 UREAD R RE M 39 June 2011
D7.3 EC dissemination material WP7 UREAD O PU M 39 June 2011
D3.2 Revised Metadata delivered into system WP3 CNRS O PU M39 June 2011
D1.5 MGT and annual reporting WP1 UREAD R RE M 42 September 2011
D2.7 Controlled Vocabularies WP2 UREAD R PU M42 September 2011
D3.3 Integration of CIM into ENSEMBLES downscaling portal WP3 UCANT P PP M42 September 2011
D1.4 Final STAB report WP1 UREAD R PU M42 September 2011
D2.6 Governance Plans Report WP2 BADC R PU M42 September 2011
D3.4 End-User Testing Report WP3 CNRS R PU M42 September 2011
D4.5 Service Report and Revised Infrastructure WP4 BADC R PU M42 September 2011
D4.6 Report on CMIP5 support WP4 BADC R PU M42 September 2011
D4.7 CIM processes (CONCIM, tools and services) documentation for IS-ENES WP4 CNRS R PU M42 September 2011

Deliverable numbers in bold have been delivered.

Please indicate the nature of the deliverable using one of the following codes:

R = Report, P = Prototype, D = Demonstrator, O = Other

Please indicate the dissemination level using one of the following codes:

PU = Public

PP = Restricted to other programme participants (including the Commission Services)

RE = Restricted to a group specified by the consortium (including the Commission Services)

CO = Confidential, only for members of the consortium (including the Commission Services)